มูลนิธิพลังงานเพื่อสิ่งแวดล้อม มพส

ESCO Revolving Fund

Download

Activities News

Summary of ESCO FUND (Phase I)

Summary of ESCO FUND (Phase II)

Summary of ESCO Revolving Fund (Phase III)

Summary of ESCO Revolving Fund (Phase IV)

Articles and Publication

Summary of ESCO Revolving Fund (Phase III)

Summary of EforE’s accomplishment on ESCO Revolving Fund Phase III

(April 2013 – 10 July 2014)

  Department of Alternative Energy Development and Efficiency (DEDE) has allocated the budget from Energy Conservation Promotion Fund (ENCON Fund), amounting to 500 Million Baht in order to top up “ESCO Revolving Fund” for encouraging private investment in renewable energy and energy efficiency projects. The Energy for Environment Foundation (EforE), one of the fund managers, was granted 300 Million Baht in Phase III (April 2013 to July 2014) in continuation of Phase II. At the end of phase III, there are 19 Projects approved for equipment leasing as described below:


Examples of equipment leasing projects awarded under the ESCO Revolving Fund
(Equipment Leasing) 19 projects


 

Examples of equipment leasing projects awarded under the ESCO Revolving Fund
(Equipment Leasing)

     
 
1. Ubonrak Co., Ltd.
Location: Ubonrak Thonburi Hospital, Ubon Ratchathani
The project of Ubonrak Thonburi Hospital is to replace the old chiller with the high efficient chiller.  EforE has provided 4.67 MB equipment leasing to support energy efficiency improvement. The equipment has already been installed and is running. This project leads to over 160,000 Baht/month energy saving.
 
     
 
2. Thai Danish International Co., Ltd.
Location: 7 Pig farms of  Thai Danish International Co., Ltd. In Prachinburi, Chonburi, Chachoengsao
The project of  Thai Danish International Co., Ltd. is to replace the fluorescent lamps with the LED in 7 pig farms. EforE has provided 3.82 MB equipment leasing to support energy efficiency improvement. The equipment has already been installed and is running. This project leads to over 194,000 Baht/month energy saving.
 
     
 
3. Nongporn Food Industries Co., Ltd.
Location: Nongporn Food Industries Co., Ltd., Nonthaburi
The project of Nongporn Food Industries Co., Ltd. is to replace the conventional cooking stove with the high efficiency boiler for seasoning sauce production. EforE has provided 3.01 MB equipment leasing to support the fuel switching project. The equipment has already been installed and is running.  This project leads to over 72,167 Baht/month fuel cost saving.
 
     
 
4. Power Innovation Co., Ltd.
Location: Thai Metal Co., Ltd. Samutprakarn
The project of Power Innovation Co., Ltd. is to install VSD for chilled water pump, condensing water pump, and cooling tower fan at Thai Metal Co., Ltd. EforE has provided 1.51 MB equipment leasing to support energy efficiency improvement. The equipment has already been installed and is running. This project leads to over 128,500 Baht/month energy saving.
 
     
 
5. APK Furnishing Parawood Co., Ltd.
Location: APK Furnishing Parawood Co., Ltd. Songkhla
The project of APK Furnishing Parawood Co., Ltd. is to replace the old motors with the high efficiency motors. EforE has provided 1.35 MB equipment leasing to support energy efficiency improvement. The equipment has already been installed and is running. This project leads to over 106,083 Baht/month energy saving.
 

Energy for Environment Foundation (E for E)
99/305 Thetsaban Songkhro Road, Lat Yao, Chatuchak, Bangkok 10900 Thailand.
Telphone (662)-953-9881-4 Fax (662)-953-9885
Copyright © 2011 Energy For Environment Foundation. All right reserved.
No. 812/66 Soi Pracha Chuen 26, Pracha Chuen Road, Wong sawang, Babgsue, Bangkok 10800 Thailand.
Tel.+66 2115 5895  E-mail : jutamas.efe@gmail.com